[Notice] Work Management at High-Value Materials and High-Risk Sites
2026 application
To all partner companies
To all in-house workers
Strictly comply with the following for sites where high-value products, flooring, marble, mirrors, glass, etc. are present.
Applies to all sites.
1. High-Risk Site Reporting
Sites that fall under the following shall be treated as high-risk:
- Glass floor
- High-value flooring such as marble, tile
- Mirror-finished wall surfaces
- Display items, brand fixtures
- Work near precision equipment
When applicable, report to the person in charge in advance. The person in charge shall clearly identify the site as high-risk and share with relevant parties.
2. Site Rounds and Confirmation
Before work starts, the person in charge shall walk the entire site.
- Confirm location of high-value materials
- Confirm traffic flow
- Confirm contact and fall risks
- Confirm base placement
- Confirm step-ladder use positions
Do not allow work to start without this confirmation. During work, make regular rounds and confirm that there are no hazardous conditions.
3. Protection
- After laying blue sheet, set plastic sheet in two layers
- Floor must have protection material laid
- Double protection for glass and marble in principle
- Contact-prevention protection for mirrors and fixtures
- Do not start work with insufficient protection
4. Tool Management
- Bag management in principle
- Bring only necessary tools
- Take drop-prevention measures for small tools
- No direct placement of tools on surfaces
5. Step-Ladder and Work Posture
- Confirm stable placement
- Ensure adequate clearance
- No sideways stance on ladder
- No work in forced posture
6. Photo Records
- Full view before work
- Existing damage confirmation
- Full view after work
Records must be kept.
7. Abnormal Situation Response
- If damage or contact is suspected, stop work immediately
- Report to person in charge
- Photo record
Do not continue on your own judgment.
Detailed Procedures and Methods
Please refer to the following links.
High-value materials and high-risk site work management standard (Procedure)
This instruction must be strictly complied with.