[Notice] Ceiling Board, Wall Board and Access Panel Removal

2026 application

Scope of application
Applies to all sites.
Effective date
March 1, 2026
Revision history
First edition

To all partner companies
To all in-house workers

Strictly comply with the following for ceiling board, wall board and access panel removal. Access panels shall be removed as a rule. Applies to all sites.

1. Supervisor Assignment

  • Removal work must be carried out with a supervisor in attendance
  • The supervisor shall focus on safety confirmation and surrounding confirmation
  • The supervisor shall in principle not focus on performing the work

2. Pre-Work Confirmation

Before starting work, carry out the following:

  • Protection of at least 1 m around the area
  • Confirmation of protection for fixtures and precision equipment
  • No work underneath
  • Confirmation of falling-object measures
  • Confirmation of step-ladder stability
  • Work scope determined

3. Pre-Work Photos

  • Full view before removal
  • Close-up of existing damage or soiling
  • Surrounding condition photos

Existing damage must be recorded.

4. Prohibited During Work

  • No work standing on the top step of the step-ladder
  • No work in sideways stance
  • No removal in forced posture
  • No tool handling that may cause dropping
  • No leaning removed materials against walls

5. Fall and Damage Prevention

  • Hold with both hands in principle when removing
  • Large boards: work with two or more persons
  • Temporary placement of removed items: place away from work area, in a place with no foot traffic
  • Removed materials: lay flat and protect
  • Collect screws and hardware; do not place directly on floor

6. Above-Ceiling Confirmation

  • Check contact with ducts, wiring, sprinklers
  • Check interference with other trades
  • If cutting or processing is needed, take dust measures

7. Restoration Confirmation

  • Confirm original position and orientation
  • Confirm screw tightening
  • Confirm looseness
  • Confirm cracks or chips
  • Confirm access panel open/close

The supervisor shall perform final confirmation after restoration.

8. Post-Work Photos

  • Full view after restoration
  • Finish confirmation photos

Before-and-after records must be kept.

Detailed Procedures and Methods

Please refer to the following links.

Ceiling, wall board and access panel removal standard (Procedure)

Safety and Quality System Top

This instruction must be strictly complied with.